The Silt Verses Wiki


The Hydroelectric Dam is located on the White Gull River.

ATTENTION: SPOILERS AHEAD! Beyond this point, major plot spoilers are expected. Continue at your own risk.

Notable Events[]

Carpenter's parents, Sandra and Gregory, were sacrificed to the Saint Electric in order to build the dam. This was done in accordance with Devlin's regulations.[1]

There is a Jolly King Kipper Wetlands Park located South of the dam.[2]

References[]